Friday, 27 November 2020

WE FINISHED OUR PRODUCT! (week 9 reflection)

1.I do feel like my team has done well because we finished quilkey 

2.we have doubt with it ourselves or we have asked a teacher

3.don't know??

4.our product,candles,paper bag and our logo

WEEK 9 PLANNING

 Today we are going to make more driftwood tea lights because Raman brought more driftwood to school this morning.One person is chiving and two people will be doing the machine work(drilling) and then we will be done.

Friday, 20 November 2020

WEEK 8 REFLETION

 


  1. What went well today for you and your team,Think about your teamwork, and your group’s product idea. we got our chiveing done our product is good but we need more driftwood.


WEEK 8 PLANNING

Today we will be chiveing and making our posters where it will say like our prises and how large the wood is and we will try to put our logo on our driftwoods.

Friday, 13 November 2020

WEEK 7 REFLECTION

 


  1. How do you think you have used your time today? i have used my time wisely today my group completed all the driftwood tea lights we had to do 2.What has been your biggest achievement today? finishing our products 3. Name someone in your class (from another group) who you think is making a cool product. What is their product and why do you think it will sell.Izan, his product is a coaster because it is costersand they love them(Izan said that just saying. 4. What do you need to do to make sure you will be on task for next week?we need more wood.


WEEK 7 PLANNING

 WE need to finish off our product and fix the angles for the driftwood because it is in an angle and the candle can fall off. We also have to do the chiving on the wood to make it tidy.

Friday, 6 November 2020

WEEK 6 PLAN

 Today we are going straight to the workshop after morning tea in block 2, Joe and I will do the drilling in the wood and Ramandeep will do the shiving then at block we will think about our marketing.

Friday, 30 October 2020

Week 4 reflection

 Something that went well for us today was that we made 2 of our final produces today and our team work today was good the difficult thing was when we drilled the holes on the wood we had to use a chive to make it even and clean it out . 1) you have to have a prototype before your final product.2) work as a team and not standing by someone doing nothing.3)need to have everything planned out. prep for next thing, we need to work as at team and finish more  driftwood tealight holders.PHOTOS OF OUR WORK TODAY DOWN HERE





PLAN FOR TODAY

 We need to get started on making our driftwood tealight today.And we will start by making a prototype

 with scrape wood and then measure the width and the height.We will need a ruler and a pencil,a drill machine, A ciaive.

Friday, 23 October 2020

Week 3 Reflection

  what want well for my team was getting our plans done today, something difficult was changing between products because we were going to make driftwood coat hangers but mrs Mcculloch said to driftwood tea light holders, three new business terms i learnt was 1.you have to be prepared and you have to have a plan 2. figure out the costs about the recorsus 3. knowing how much profit you need back. having my driftwood and candles.

Driftwood coat hangers plan

 on Sunday Joe, Raman and I will go to Waikanae beach to collect driftwood and driftwood sticks @2.00pm we will be trying to get 10 pieces of driftwood and 40 pieces of driftwood stick. Joe will go with his dad to the beach and Me and raman will go there by biking. We are going to get the drift wood and the driftwood stick and we will drill a hole and then hot glue 4 pieces on to the driftwood.Sustainability our resources are sustainability because we are not cutting wood out of actual trees which depletes natural resources that is not being sustainable. so using driftwood is a good idea.

Friday, 25 September 2020

Driftwood coat hangers

 My product is driftwood coat hangers its a simple piece wood found by the beach and then transformed into coat hangers it can hold anything light for e.g coats,hats,pants and jewelry it will be black with silver metal rods as hangers.https://docs.google.com/drawings/d/11hHRXqdaPEPmxrlUiLsm4hRjYRD5rvWkIKx8MuwRRLs/edit

(drawing of my  driftwood coat hangers)☝


Friday, 18 September 2020

PREP REFLECTION WEEK 1

 Some thing that want well for my team was making the paper planes and making our logos,My group are making a drift wood hanger. something difficult  was making the logo because we were shout to each other witch one we are picking but at the end we got it. To finish off our logo


Monday, 9 March 2020

first blog for Whangara

In week 6 we went for a walk to nealon park to see the freezing works and if its still there.Their are little parts of the factory like scraps there is a pillar,front of a boat piese.

In week 6 we learnt about mussels, and how they clean the water after that, we dissected the mussel.



In week 4 we went to the town museum to learn about how Gisborne used to look like before when the maori came to Nz and now.And we went on an exitbhon about what they used for hunting,wearing cloth.